The Mjólkárvirkjun hydroelectric project is the Westfjord peninsula's largest power plant. Verkís involvement began in 1985 with the refurbishment of the electrical equipment of Mjólkárvirkjun I and continues to this date....
Read moreAndakílsárvirkjun is the largest hydro power plant in western Iceland and was the first grand HEP to be totally designed and constructed by Icelanders. Verkís' involvement began in 1995 with a ....
Read moreThe Ilulissat Hydroelectric Project is the third one in Greenland with Verkís as the main designer. The installed power will be 22.5 MW.....
Read more
The Bardu Hydroelectric Projects are located in North-Norway at 68°N. Verkis is a consultant in the projects and has provided extensive services as well as completing the final civil design...
Read moreThe Sog hydroelectric project consists of three power plants harnessing the water of the river Sog, with a combined gross head of 75.5 m and a power capacity .....
Read more
The government of Greenland has a great ambition to replace fossil fuelled power plants with renewable energy. The focus has been on hydropower and the Qorlortorsuaq ..........
Read more
The Sisimiut hydroelectric scheme is located in West Greenland some 100 km north of the arctic circle. The project harnesses the natural lake of Tasersuaq......
Read more
Verkís's involvement began with the initial planning in the early seventies. An appraisal report was prepared in 1975 and a project planning report was issued in 1982.....
Read more
Verkís participated in the initial planning phase around 1950 and completed the final civil design for the construction of the powerhouse and concrete dam. The firm provided the..
Read more
Engineering consulting services were provided by Verkís firms during all prefeasibility stages of the project. After a feasibility study in 1993 the firms prepared tender documents and...
Read more
Verkís has been involved in planning of the Kárahnjúkar hydroelectric scheme since 1978. Services included project planning, feasability studies, tender documents, mechanical design, environmental impact assessment and supervision......
Read more
The Lagarfljót river is dammed by an earthfill type intake dam including a gated spillway for flood control. A 500 m headrace canal is excavated on the right river bank leading into an intake and...