Reconstruction of OR's West building
Verkís is responsible for all engineering design. The building is designed in BIM building information system.

School in Nuuk
Verkís is responsible for almost all engineering design. The building is designed in BIM building information system.

New Sólvangur - Nursing Home
Verkís was responsible for construction supervision, site supervision of concrete constructions and landscaping.

Outdoor center in Heiðmörk
Verkís is responsible for fire technical design and designing of structure, pipes and electric systems.

Landspítali - Patient Hotel
Verkís handled fire engineering design and sound design, as well as construction supervision and construction management.

Multifunctioning sports hall in Selfoss
Verkís is responsible for all engineering design along with design and project management. The project is carried out according to the BIM methodology.

Álfaborg - Kindergarten
Verkís was responsible for engineering design and consultancy of engineering factors.

Multifunctioning Sports hall in suður Mjódd
Verkís is responsible for preliminary design, is a consultant to the buyer, a member of the building committee, prepares tender documents and supervises the project.

Sisimiut - Swimming pool inside a Rock
Verkís is responsible for all consultation, i.e. all preliminary design with related feasibility studies and rock technology analyzes. Verkís also works on the preparation of tender documents for actual construction. Verkís is the project's main consultant.
Drøbak swimming facility
Verkís was responsible for project management, cost estimates, all engineering design, transportation systems, geotechnical engineering, management of building permit licensing, preparation of tender documents, construction time consultation, and preparation of the operating manual. The project is based on BIM methodology.

Holmen - swimming facility
Verkís was responsible for project management, cost estimates, all engineering design, transportation systems, geotechnical engineering, management of building permit licensing, preparation of tender documents, construction time consultation, and preparation of the operating manual. The project is based on BIM methodology.