Sports Facility
Headline list

Multifunctioning sports hall in Selfoss
Verkís is responsible for all engineering design along with design and project management. The project is carried out according to the BIM methodology.
Read more
Multifunctioning Sports hall in suður Mjódd
Verkís is responsible for preliminary design, is a consultant to the buyer, a member of the building committee, prepares tender documents and supervises the project.
Read more
Multifunctioning sports hall in Garðabær
Verkís is responsible for all engineering design.
Read more
Sisimiut - Swimming pool inside a Rock
Verkís is responsible for all consultation, i.e. all preliminary design with related feasibility studies and rock technology analyzes. Verkís also works on the preparation of tender documents for actual construction. Verkís is the project's main consultant.
Read more
Sea Baths in Húsavík
All Engineering design work and consultancy during the contract period.
Read moreDrøbak swimming facility
Verkís was responsible for project management, cost estimates, all engineering design, transportation systems, geotechnical engineering, management of building permit licensing, preparation of tender documents, construction time consultation, and preparation of the operating manual. The project is based on BIM methodology.
Read more
Holmen - swimming facility
Verkís was responsible for project management, cost estimates, all engineering design, transportation systems, geotechnical engineering, management of building permit licensing, preparation of tender documents, construction time consultation, and preparation of the operating manual. The project is based on BIM methodology.
Read more
Blue Lagoon, geothermal spa
Verkís services was project planning, conceptual and detail design, preparation of tender documents, material procurement and supervision of construction. Ventilation systems, piping systems: heating, snow-melting, domestic and waste water, electrical installations, lighting design and structural design.
Read more