Verkís handled the design of control systems for the building management system and distribution systems for production and auxiliary systems.
Gönguskarðsá was harnessed in 1947 to 1949. Verkís managed all the design of structures and equipment and construction supervision.
Viðey is the sister ship of Engey and Akurey, and Engey's systems were copied with considerable modifications to Viðey.
Glerárstífla is an approximately 90 metre long and 7.4 metres high concrete dam in Glerárdal in Akureyri and is part of Glerárvirkjun II.
The gas and composting station, GAJA, is intended for the reuse of organic household waste from the Greater Reykjavík Area.
The project Micro Power Plants in the Westfjords was approved as a focus project in 2019 within the Westfjords’ expansion plan.
There is no excerpt because this is a protected post.
Hvolsvöllur substation was built to strengthen the transmission system in South of Iceland and is located in Hvolsvöllur.
Elkem Iceland (former Icelandic Alloys Ltd.) was established in 1975 by the Icelandic government in cooperation with Union Carbide.