Hydropower

Headline list

Búrfell

Búrfell Hydropower plant - extension

Verkís services is preparation of tender documents for the project together with tender design, final design, design review as well as assistance during procurement and construction.

Read more
Mjolka

Mjólká - Hydroelectric Project

The Mjólkárvirkjun hydroelectric project, is situated in Arnarfjörður fjord in the Westfjords of Iceland. The project harnesses the fresh water rivers Mjólká and Hofsá. The power plant was first operated in 1958 and harnessed energy from Borgarhvilftarvatn reservoir. It is owned by the Westfjord Power Company.

Read more
Qorlortorsuaq-vatnsafl

Qorlortorsuaq hydropower plant

Verkís scope of services encompassed feasibility study and site evaluation; EPC bid preparation; Tender design for subcontractors; final design of all civil work; Detail design and/design review of all electrical and mechanical equipment; Site acceptance and commissioning.

Read more
Tanesco-Tanzania

Tanesco Tanzania

Verkís services is review of tenders and contracting, design review, mechanical and electrical shop inspections, project management, site supervision and monitoring of refurbishing work, commissioning and guarantee inspection.

Read more
Budarhalsvirkjun

Búðarháls hydropower plant

Verkís services was review of project planning design and design criteria, review of civil work design, tender design of mechanical and electrical equipment, tender documents, evaluation of bids and contracting, design review for electromechanical equipment and detail design for mechanical and electrical systems in buildings.

Read more
Bardu-vatnsaflsvirkjun

Bardu hydropower plants

Verkís services was evaluation of site and surveying (cartography), environmental documentation (n. Landskabs og miljøplan), technical documentation (n. Teknisk detjaljplan), tender documents for pressure pipe and civil works design (excavation, concrete, hydraulic etc.).

Read more
Sisimiut-vatnsaflsvirkjun

SisimIut hydropower project

Verkís scope of services encompassed feasibility study and site evaluation; EPC bid preparation; Tender design for subcontractors; final design of all civil work; Detail design and/design review of all electrical and mechanical equipment; Site acceptance and commissioning.

Read more
Sultartangavirkjun

Sultartangi hydropower plant

Verkís services was feasibility study, project planning, economic study, tender documents, civil work design, mechanical systems design, electrical systems design, environmental impact assessment, supervision, commissioning and startup.

Read more
Blönduvirkjun

Blanda hydropower plant

Verkís services was feasibility study, project planning, economic study, tender documents, civil work design, mechanical systems design, environmental impact assessment and electrical systems design.

Read more
Karahnjukavirkjun

Kárahnjúkar hydropower plant

Verkís has been involved in the planning of the Kárahnjúkar hydroelectric scheme since 1978. A feasibility report was issued in 1999 and a project planning report in 2000. Verkís provided complete engineering services including project planning, feasibility studies, tender documents, economic study, technical study, civil work design, mechanical design, electrical systems design, design review, environmental impact assessment and supervision.

Read more
Ilulissat-vatnsaflsvirkjun

Ilulissat hydropower plant

Verkís services was project planning, evaluation of site, civil work design (excavation, concrete, hydraulic etc.), mechanical design (metal, piping, ventilation etc.), high- and medium voltage systems design, control-, safety and communication systems design, tender documents and coordination for el-mech systems, commissioning and coordination and lead engineering of the design.

Read more
Dariali

Dariali hydropower plant

Verkís services was feasibility study, project design, tender documents, detail design of civil works and design review.

Read more