Environmental impact assessments
Headline list

PCC silicon metal plant at Bakki
Verkís services was predesign, tender design, technical tender documents, cost estimate, project planning/scheduling, piping system, ventilation and electrical systems.
Read more
Fjarðaál aluminium smelter
Verkís services was participation in the project as leading partner in HRV Engineering, teaming up with Bechtel Corp. as Bechtel-HRV, feasibility study, engineering in various fields, cost estimation, execution planning, preparation of bid documentation and review of bids, site execution management, site supervision and quality control.
Read more
Blanda hydropower plant
Verkís services was feasibility study, project planning, economic study, tender documents, civil work design, mechanical systems design, environmental impact assessment and electrical systems design.
Read more
Sundahöfn harbour
Verkís services was masterplan study, field investigation, surveys and preparation of tender documents.
Read more
Reykjanesbraut / Hafnarfjörður
Verkís handled many aspects of the design of Reykjanesbraut highway between Hafnarfjordur and Keflavik, including design of road and paths, five grade separated junctions, bridges and underpasses, drainage design, street lighting, preparation of tender documents and procurement.
Read more