Environmental issues

Headline list

Grænland fjölbýli

Analysis and disposal of hazardous waste - Maniitsoq

Verkís was responsible for environmental analysis and planning of disposal of hazardous waste. 

Read more
Kisilverksmidjan-PCC-a-Bakka

PCC silicon metal plant at Bakki

Verkís services was predesign, tender design, technical tender documents, cost estimate, project planning/scheduling, piping system, ventilation and electrical systems.

Read more
Fjaraal-Reydarfirdi

Fjarðaál aluminium smelter

Verkís services was participation in the project as leading partner in HRV Engineering, teaming up with Bechtel Corp. as Bechtel-HRV, feasibility study, engineering in various fields, cost estimation, execution planning, preparation of bid documentation and review of bids, site execution management, site supervision and quality control.

Read more
Vindmyllur

Birds and windmills at Búrfell

Verkís services was preparation, reports, studies around Búrfell to assess collision risks, density and the spread of breeding birds along with other studies.

Read more
Blönduvirkjun

Blanda hydropower plant

Verkís services was feasibility study, project planning, economic study, tender documents, civil work design, mechanical systems design, environmental impact assessment and electrical systems design.

Read more